Four walls and five working windows!

Last weekend Jeff and I tore down the final wall of the shed and rebuilt it.  We went back to the Depot and bought another 20 2x4s.  There is now not a single original 2x4 in the framing of this shed! 

After finishing framing the walls and installing the windows we tackled leveling the shed.  Yes, several times of the lifetime of this project we realized we were working backwards.  According to Jeff's level our work here is now complete.  All it took was jacking up the building and adding concrete blocks until it was perfect. 

Talk about difficult to start from the roof then go to the walls and finally the leveling of the structure.  What can I say, we like a challenge?

I'm was a little tired of going to Home Depot so this weekend we took it easy and didn't work on a single home project!  We're going to buy the siding when we get back from our Argentina trip in early December.

Here are project photos of the shed: